3-18: POWER CURBER MACHINE

CODE NO. ITEM QTY 4

03-01-01184

CURB AND GUTTER MACHINE

CRAWLER TYPE WITH 3 TRACKS

SUITABLE FOR ROADS 6M WIDE

EQUIPPED WITH MOLDS FOR CURB,BARRIER, TRENCH, TO BE EASY

CHANGE TYPE.

SUITABLE FOR PAVING ROADS 6M WIDE WITH CONCERT

SUPPLIED WITH CONCRETE VIA BELT CONVEYER (SWING) AND NOT WITH

AUGER CONVEYOR

EQUIPPED WITH TRIMMER TO CUT SOIL.(DEPTH UP TO 100MM ).

WORKING WITH COMPLETE HYDRAULIC SYSTEM

AND ELECTRONIC SENSORS FOR ALL ACTIVITIES

ONE SINGLE PASS TYPE (CUTTING SOIL AND CASTING CONCRETE IN ONE

TIME).

SUITABLE FOR CASTING STREET SHOULDERS UP TO 3 M

HEIGHT AND ALIGNMENT CONTROLLED BY ELECTRONIC SENSORS

WORKING WIDTH: 2-6M

MAX. PAVING THICKNESS: 450 MM

ENGINE OUT PUT: 123 KW/167 PS

WEIGH: 13-27 TON. DEPENDING ON JOB.(CURBING OR PAVING).

FOR CASTING CURBS UP TO 630 MM HEIGHT, AND GUTTER UP TO 800 MM

AND BARRIER UP TO 900 MM (ADJUSTABLE)

DIESEL ENGINE RATTED AT 84.5 HP.,2500 RPM

EQUIPPED WITH WATER TANK 300 L. HIGH PRESSURE

WITH SPARE PARTS FOR TWO YEARS OPERATION

3-19: ASPHALT PLANTS:



CODE NO.

ITEM

OTY

03-01-01185

COMPLETE ASPHALT PLANT WITH CAPACITY NOT LESS THAN ( 250-300 T/HR) .OR(500 M^ ), WITH COMPLETE FILTERING SYSTEM ( FILTERIZED) AGAINST POLLUTION DETAILS OF PLANT: UN PORTABLE FILLER TANK WITH A CAPACITY NOT LESS THAN: 260 TON. BITUMEN TANK WITH AUTOMATIC HEAT CONTROL FOR OIL

TEMPERATURE FOR EACH OF THREE TANKS WITH A CAPACITY OF 60M1 ALL ACTIVITIES IS AUTOMATIC AND CONTROLLED BY COMPUTER SCREENING SYSTEM WORKS ON SCREENING AND BY PASS. TURBINE PUMP SHALL BE MECHANICAL TYPE (NO RUBBER PARTS). GENERATOR FOR STARTING THE HEAT EXCHANGER OF THE PLANT WITH ELECTRIC PROTECTION SYSTEM AGAINST ANY CHANGE IN THE CURRENT GENERATOR WITH AUTOMATIC CHANGE OVER(1000 KVA) THE DRYER TO BE DRIVEN EITHER BY FRICTION OR CHAIN. SILOS FOR STORING ASPHALT WITH A CAPACITY NOT LESS THAN 300 TON. WITH HEATING SYSTEM WITH 5 HOPPERS WITH A CAPACITY OF 12M3 EACH. WITH ADDITIONAL GENERATORS NOT LESS THAN 150 KVA FOR THE BITUMEN HEATER WITH AUTOMATIC FIRE PROTECTION SYSTEM FOR THE BITUMEN HEATER AND MAIN CABIN . THE PLANT SHOULD HAVE COMPLETE SYSTEM FOR FIRING TREATMENT (FIRING ACCIDENT)

2